Floriston Renovation

Residential Remodel | Full Interior Reconstruction + System Upgrades

The Floriston project involved the transformation of an aging structure originally built in 1910. The home required a full interior rebuild to bring it up to modern standards while maintaining the integrity of the existing structure. Tradecraft worked closely with the client to evaluate the space, identify limitations, and create a clear path forward before construction began.

What started as an outdated interior was taken down to the framing and rebuilt with updated systems, refined finishes, and improved functionality. The result is a home that feels cohesive and intentional, while performing to the expectations of modern living.

 

Scope of Work

  • Full interior demolition down to exposed wood framing

  • Structural reframing to true walls and correct inconsistencies from original 1910 build

  • Exterior door removal, relocation, and new opening installation

  • Installation of new cedar lap siding at modified exterior areas

  • Electrical upgrades with new wiring for lighting and outlets throughout

  • Full plumbing replacement including removal of galvanized lines and installation of copper system

  • Installation of new exterior windows

  • Full insulation package including attic

  • 5/8" drywall installation with Level 5 smooth finish throughout

  • Installation of knotty alder interior doors, trim, and baseboards

  • Custom kitchen cabinet installation

  • Fabrication and installation of concrete countertops

  • Tile flooring and backsplash installation

  • Installation of new wood flooring throughout

  • Full interior paint across rebuilt areas

Execution

Given the age of the structure, the project required careful evaluation and adjustment at every phase. Walls were reframed to correct inconsistencies and create a true, level foundation for all finishes and systems moving forward. Each upgrade was approached with the understanding that older construction requires flexibility and problem solving.

From plumbing and electrical replacement to finish installation, every phase was sequenced to ensure alignment across trades. The work was executed with attention to detail so that new systems, materials, and finishes integrated cleanly within the existing structure.

Build Detail

This project required a balance between reconstruction and refinement. With the home stripped to its framing, each decision had to support both structural integrity and long-term performance. Coordination across framing, mechanical systems, and finishes ensured the project moved forward without conflict.

The finished result is a fully rebuilt interior that feels grounded, clean, and durable. Updated systems, corrected structure, and elevated finishes come together to create a home that not only looks improved, but functions reliably for years to come.

Previous
Previous

Alpenswing

Next
Next

Liv Studio