Humane Society of Truckee Tahoe

Commercial Buildout | Multi-Phase Tenant Improvement

Overview:

The Humane Society of Truckee Tahoe required a complete transformation of leased commercial space to support their operations. With no prior experience navigating the construction process, Tradecraft stepped in early to guide planning, permitting, and execution from the ground up.

Delivered in two phases across separate units, the project involved full interior buildouts, system upgrades, and coordination with multiple regulatory agencies. Each phase was completed with a focus on functionality, compliance, and long-term durability.

 

Scope of Work

Phase One – 4,000 SQFT Buildout

  • Client guidance through planning, permitting, and project setup

  • Design coordination to establish functional layout within leased space

  • Construction of dividing wall to separate operational areas

  • Electrical rework to accommodate new layout requirements

  • Construction of two change rooms

  • Drywall installation throughout new partitions

  • Full interior paint across entire space

  • Installation of interior doors, trim, and baseboards

  • Coordination and management of all inspections including fire, sanitation, environmental health, and utilities

  • Permit closeout and certificate of occupancy

Phase Two – 3,200 SQFT Full Renovation

  • Complete demolition of existing tenant improvements down to concrete

  • Reconfiguration of HVAC ducting to support new layout

  • Installation of new drop ceiling system

  • Full electrical installation including lighting, outlets, and switching

  • Framing of new access openings between existing and new spaces

  • Installation of 5/8" drywall throughout

  • Full interior paint

  • Installation of commercial-grade tile flooring and baseboards

  • Coordination and management of all inspections including fire, sanitation, environmental health, and utilities

  • Permit closeout and certificate of occupancy

Execution

This project required disciplined coordination across two separate build phases, each with its own constraints and regulatory requirements. Working within leased commercial units, Tradecraft managed sequencing, inspections, and system integration to ensure both spaces were delivered efficiently and brought online without delays.

Close coordination with local agencies ensured compliance at every stage, while careful planning allowed both phases to align operationally as a cohesive environment.

Build Detail

The success of this project came down to structure and follow-through. From early client education to final inspection sign-off, every step was handled with clarity and control.

Both phases were delivered as fully functional, code-compliant environments built to support daily use and long-term reliability. The finished spaces reflect a clean, durable build standard while meeting the operational needs of the Humane Society from day one.

Previous
Previous

Northstar Residential Renovation